This paper presents a hybrid system consisting of a 100 kWe micro gas turbine (MGT) that juxtaposes the energy production of a photovoltaic (PV) plant whose yearly yield is available by on field measurements. The aim of the work is to model and investigate the behavior and the performance of a hybrid MGT-PV system under the topical constraint of firming renewable power and hence of guaranteeing a reliable power production to the grid. We propose a solution for the sizing of the PV plant and two strategies for the management of the hybrid system in order to guarantee a reliable day-ahead hourly forecast of the electric power that can be actually produced by the plant under whatever ambient condition. The results ascertain the advantages of the upgraded system in terms of natural gas consumption (−16%) and and NOX (∼ −33%) with a higher local emission of CO. In particular, the proposed hybrid system: i) solves the problem due to the unpredictability of PV energy production; ii) grants a significant reduction of the primary fuel usage and specific energy cost; but iii) increases the level of local pollutants, since it internalizes the emissions previously generated in a centralized power plant to produce the amount of electricity of the hybrid system.

Hybrid system with micro gas turbine and PV (photovoltaic) plant: Guidelines for sizing and management strategies / Comodi, Gabriele; Renzi, Massimiliano; Cioccolanti, Luca; Caresana, Flavio; Pelagalli, Leonardo. - In: ENERGY. - ISSN 0360-5442. - 89:(2015), pp. 226-235. [10.1016/j.energy.2015.07.072]

Hybrid system with micro gas turbine and PV (photovoltaic) plant: Guidelines for sizing and management strategies

COMODI, Gabriele;CARESANA, FLAVIO;PELAGALLI, Leonardo
2015-01-01

Abstract

This paper presents a hybrid system consisting of a 100 kWe micro gas turbine (MGT) that juxtaposes the energy production of a photovoltaic (PV) plant whose yearly yield is available by on field measurements. The aim of the work is to model and investigate the behavior and the performance of a hybrid MGT-PV system under the topical constraint of firming renewable power and hence of guaranteeing a reliable power production to the grid. We propose a solution for the sizing of the PV plant and two strategies for the management of the hybrid system in order to guarantee a reliable day-ahead hourly forecast of the electric power that can be actually produced by the plant under whatever ambient condition. The results ascertain the advantages of the upgraded system in terms of natural gas consumption (−16%) and and NOX (∼ −33%) with a higher local emission of CO. In particular, the proposed hybrid system: i) solves the problem due to the unpredictability of PV energy production; ii) grants a significant reduction of the primary fuel usage and specific energy cost; but iii) increases the level of local pollutants, since it internalizes the emissions previously generated in a centralized power plant to produce the amount of electricity of the hybrid system.
2015
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11566/229212
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 31
  • ???jsp.display-item.citation.isi??? 21
social impact