Some would argue that during the last few decades the studies on IC measurements have mainly been focused on the design and implementation of accounting concepts, methods and tools while they have devoted little attention to the understanding of what happens to the measurements after they are ‘produced’, i.e. how measurements are used. Stemming from these considerations, the aim of this paper is to reflect on the relationship between design, implementation and use of IC measurements in practice. In order to achieve this aim, we present a longitudinal case study referred to the design, implementation and use (or non–use) of an IC measurement and reporting system. The main findings are the following. First, measuring can lead to the emergence of new managerial objects. Second, it seems that in the IC discourse numbers are relevant not only for sizing but also for creating an IC dimension to be managed. Third, the use of measurements do not necessarily follow their production but can be instead, simultaneous. With reference to single indicators, the following considerations emerge. First, the inclusion of ‘old’ indicators within the IC measurement system can lead to a change in their meaning. Second, the use of the measurements depends on how they are labelled, too. Third, in an IC project, more than the ‘result’ it is the activated understanding and learning process that matters.

The design, implementation and use of intellectual capital measurements: A case study / Chiucchi, MARIA SERENA; Giuliani, Marco; Marasca, Stefano. - In: MANAGEMENT CONTROL. - ISSN 2239-0391. - STAMPA. - 2(2014), pp. 139-163.

The design, implementation and use of intellectual capital measurements: A case study

CHIUCCHI, MARIA SERENA;GIULIANI, MARCO;MARASCA, STEFANO
2014-01-01

Abstract

Some would argue that during the last few decades the studies on IC measurements have mainly been focused on the design and implementation of accounting concepts, methods and tools while they have devoted little attention to the understanding of what happens to the measurements after they are ‘produced’, i.e. how measurements are used. Stemming from these considerations, the aim of this paper is to reflect on the relationship between design, implementation and use of IC measurements in practice. In order to achieve this aim, we present a longitudinal case study referred to the design, implementation and use (or non–use) of an IC measurement and reporting system. The main findings are the following. First, measuring can lead to the emergence of new managerial objects. Second, it seems that in the IC discourse numbers are relevant not only for sizing but also for creating an IC dimension to be managed. Third, the use of measurements do not necessarily follow their production but can be instead, simultaneous. With reference to single indicators, the following considerations emerge. First, the inclusion of ‘old’ indicators within the IC measurement system can lead to a change in their meaning. Second, the use of the measurements depends on how they are labelled, too. Third, in an IC project, more than the ‘result’ it is the activated understanding and learning process that matters.
2014
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11566/199103
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact