Industrial and chemical plants, especially oil refineries, are highly energy-consuming plants. Several energy efficiency interventions are being currently performed: besides gas recovery solutions, also energy recovery in liquid flows can be applied. In this paper, a case study of an Italian oil refinery regarding the use of a Hydraulic Power Recovery Turbine (HPRT), which is installed in a Hydrogen Sulphide (H2S) removal process from the Syngas produced by an Integrated Gasification Combined Cycle (IGCC), is analysed and presented. The real performance data of the process are discussed: on average, 353.4 t/h of liquid SELEXOL can be elaborated by the HPRT with 445.4 m of head. Finally, the recovered electrical energy on a yearly basis is equal to 2966 MWh, or 531 tons of carbon dioxide equivalent. The pay-back period of the intervention ranges indicatively between 6 and 9 years, depending on the discount rate.
Energy Recovery in an Italian Oil Refinery by Means of a Hydraulic Power Recovery Turbine (Hprt) Installed in a H2S Removal Process / Rossi, Mose; Comodi, Gabriele; Piacente, Nicola; Renzi, Massimiliano. - In: ENERGY PROCEEDINGS. - ISSN 2004-2965. - 2:(2019). ( 11th International Conference on Applied Energy, ICAE 2019 Västerås, Swe 12-15 August 2019) [10.46855/energy-proceedings-1034].
Energy Recovery in an Italian Oil Refinery by Means of a Hydraulic Power Recovery Turbine (Hprt) Installed in a H2S Removal Process
Rossi, Mose;Comodi, Gabriele;
2019-01-01
Abstract
Industrial and chemical plants, especially oil refineries, are highly energy-consuming plants. Several energy efficiency interventions are being currently performed: besides gas recovery solutions, also energy recovery in liquid flows can be applied. In this paper, a case study of an Italian oil refinery regarding the use of a Hydraulic Power Recovery Turbine (HPRT), which is installed in a Hydrogen Sulphide (H2S) removal process from the Syngas produced by an Integrated Gasification Combined Cycle (IGCC), is analysed and presented. The real performance data of the process are discussed: on average, 353.4 t/h of liquid SELEXOL can be elaborated by the HPRT with 445.4 m of head. Finally, the recovered electrical energy on a yearly basis is equal to 2966 MWh, or 531 tons of carbon dioxide equivalent. The pay-back period of the intervention ranges indicatively between 6 and 9 years, depending on the discount rate.| File | Dimensione | Formato | |
|---|---|---|---|
|
Rossi_Energy-Recovery-Italian-Oil-Refinery_2019.pdf
accesso aperto
Tipologia:
Versione editoriale (versione pubblicata con il layout dell'editore)
Licenza d'uso:
Creative commons
Dimensione
553.43 kB
Formato
Adobe PDF
|
553.43 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


