The paper describes the static and dynamic testing of the “Filomena Delli Castelli”cable-stayed bridge over the Saline River, in the Pescara province (Italy), having main span of 103.4 m and total length of 188.6 m.
Static and dynamic testing of the “Filomena Delli Castelli” bridge
Raoul Davide Innocenzi
;Sandro Carbonari;Fabrizio Gara;Luigino Dezi
2020-01-01
Abstract
The paper describes the static and dynamic testing of the “Filomena Delli Castelli”cable-stayed bridge over the Saline River, in the Pescara province (Italy), having main span of 103.4 m and total length of 188.6 m.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.