Sfoglia per Autore  

Opzioni
Mostrati risultati da 21 a 40 di 166
Titolo Data di pubblicazione Autore(i) File
Phosphorus removal from anaerobic supernatants: Start-up and steady-state conditions of a fluidized bed reactor full-scale plant 1-gen-2006 Battistoni, Paolo; Paci, Barbara; Fatone, Francesco; Pavan, Paolo
Application of a membrane bioreactor for the treatment of low loaded domestic wastewater for water reuse 1-gen-2006 Fatone, Francesco; Battistoni, Paolo; Pavan, P; Cecchi, F.
From the demonstration plant to the full scale application: behaviour and treatment capacity of alternating process in membrane bioreactors for wastewater treatment and reuse. 1-gen-2006 Fatone, Francesco; Battistoni, Paolo; Bolzonella, D; Pavan, P; Cecchi, F.
UF membranes for urban wastewater treatment: overview on occurrence and removal of metals, PAHs and VOCs 1-gen-2006 Fatone, Francesco; Battistoni, Paolo; Pavan, P; Cecchi, F.
Phosphogypsum leachate: Treatment feasibility in a membrane plant 1-gen-2006 Battistoni, Paolo; Carniani, Enrico; Fatone, Francesco; Balboni, Pietro; Tornabuoni, Pierluigi
Food waste disposers and alternate cycles® process for the integrated management of municipal wastewater and organic kitchen waste: a case study 1-gen-2006 Battistoni, Paolo; Fatone, Francesco; Bolzonella, D; Battistoni, E. M.
Alternate cycles process for small and large WWTPs 1-gen-2006 Cola, E; Fatone, Francesco; Amoruso, E; Battistoni, Paolo
Full scale application of the coupled alternate cycles-membrane bioreactor (AC-MBR) process for wastewater reclamation and reuse 1-gen-2006 Battistoni, Paolo; Fatone, Francesco; Bolzonella, D; Pavan, P; E. M., Battistoni
Comparazione MBR e trattamenti terziari per la rimozione ad alta efficienza di microinquinanti prioritari 1-gen-2006 Battistoni, Paolo; Cola, E; Fatone, Francesco
Full scale MBR operating the alternate cycles: one year experiences and process validation. 1-gen-2006 Battistoni, Paolo; Fatone, Francesco; Cecchi, F; Pavan, P; Battistoni, E. M.
A methodology to upgrade municipal WWTPS by alternating system. The eight international conference on chemical and process engineering 1-gen-2007 Cola, E.; Battistoni, Paolo; Fatone, Francesco; Pavan, P.
Micropollutants Removal and Operating Strategies in Ultrafiltration Membrane Systems for Municipal Wastewater Treatment:  Preliminary Results 1-gen-2007 Battistoni, Paolo; Emanuela, Cola; Fatone, Francesco; David, Bolzonella; Eusebi, ANNA LAURA
Micropollutants removals and operating strategies in ultrafiltration membrane systems for municipal wastewater treatment: preliminary results. 1-gen-2007 Battistoni, Paolo; Cola, E; Fatone, Francesco; Bolzonella, D; Eusebi, ANNA LAURA
Long-term operation of a full scale intermittent MBR. The eight international conference on chemical and process engineering 1-gen-2007 Fatone, Francesco; Battistoni, Paolo; Pavan, P.; Cecchi, F.
Application of food waste disposers and alternate cycles process in small decentralized towns: a case study 1-gen-2007 Battistoni, Paolo; Fatone, Francesco; Passacantando, D; Bolzonella, D.
Exploring the potential of membrane bioreactors to enhance metals removal from wastewater: pilot experiences 1-gen-2007 Fatone, Francesco; Eusebi, ANNA LAURA; Pavan, P; Battistoni, Paolo
Operation and maintenance of full scale MBRs for municipal wastewater treatment and reuse: a detailed overview on a case study. 1-gen-2007 Fatone, Francesco; Battistoni, Paolo; Pavan, P; Cecchi, F.
Switching small WWTPs from extended to intermittent aeration: process behaviour and performances 1-gen-2008 Eusebi, ANNA LAURA; Carletti, G.; Cola, E.; Fatone, Francesco; Battistoni, Paolo
Long term experience with an automatic process control for nitrogen removal in membrane bioreactors. 1-gen-2008 Fatone, Francesco; Battistoni, Paolo; D., Bolzonella; P., Pavan; F., Cecchi
A methodology to upgrade municipal wastewater treatment plant by the alternate cycles process. 1-gen-2008 Battistoni, Paolo; Fatone, Francesco; Cola, E; Pavan, P.
Mostrati risultati da 21 a 40 di 166
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile